免费看无码一级A片在线播放_国产精品人人做人人爽人人添_亚洲AⅤ无码一区二区波多野按摩_在线观看91精品国产网站_亚欧成a人无码精品vA片

完结小说排行榜
 
  網(wǎng)站首頁 公司簡介 產(chǎn)品展示 工程展示 行業(yè)新聞 人才招聘 在線咨詢 聯(lián)系我們
 
 LED series
 Moving head light series
 Film and theatre lighting series
 Follow light series
 Outdoor light series
 Fog machines
 Strobe light series
 Stage light series
 Laser light series
 Controller series
 accessories series
 
News content
Installation standard and installation specification for stage lighting engineering
Source:ANDY         Time:2019-3-3 10:56:03

1) the organization to participate in the work of all the staff of the important significance of the project, construction difficulties, especially the time requirements, safety requirements, quality requirements, etc.

For a detailed explanation, so that everyone understand the goals and responsibilities, to ensure the construction quality and schedule.

(2) of all personnel participating in the construction of the necessary pre job training, safety education, through the examination qualified issued certificate, at the same time, the staff were

Technical disclosure system. In each procedure before the start, according to the technical documents on the operation layer construction technical clarification process.

(3) to prepare the office, life and warehouse facilities, improve office and living conditions, set up temporary power supply lines for construction and life;

(4) on the one hand, the owner of the consultation with the owner to find material warehouse, on the other hand to arrange material management personnel to contact the required equipment, materials, the specific delivery plan, at the same time

Purchase materials for investigation, quality and cost comparison, according to the requirements of the construction unit to determine the procurement of manufacturers, to improve the warehouse, then purchase approach.

(5) under the auspices of the project manager, tissue engineering and technical personnel earnestly do a good job in construction drawings, construction drawings to detailed and standardized, in line with the state of

Drawing standards, and reflect the specific requirements of the construction site and the construction organization, construction personnel must be familiar with the construction drawings, technical information, specifications, seminars

Difficulties, early detection of problems, and timely to the construction unit and design units to reflect, so that the problem is solved in the construction, to ensure the smooth progress of the construction,

Reduce change negotiation.

(6) the construction unit assigned project deputy manager for a construction project shall be responsible for the organization. A professional foreman 2 people, materials, budget, quality inspector

One, the safety officer, the fire fighters, labor and management personnel shall comply with the relevant regulations and regulations of the relevant regulations of the Chinese and Henan province; the labor personnel shall, according to the progress of the project

And the size of the project to increase or decrease, the estimated peak of 20 people.

(7) the project manager in front of the sub project construction, the implementation of construction technical clarification, especially to the construction difficulties, sub project technical measures should be put forward.

At the same time and materials together to do phase feeding plan, the construction schedule according to the benign development, to ensure the smooth construction.

(8) to establish site equipment detection system and equipment out of the box early detection of qualified, under the supervision of the project supervision immediately, and suppliers of equipment for electrical

Detection of gas and mechanical performance, to ensure that the quality of the equipment meets the design requirements. At the same time, the project manager management system is set up to implement the quality responsibility,

To ensure that the quality management system can be effectively transferred at the start of the project.

(9) the construction machinery and equipment testing instrument configuration according to the plan, by the contractor to provide transportation to the construction site.

(10) the establishment of the implementation of the construction organization design, priority to the use of the construction process standards, for the characteristics of the project, the preparation of detailed construction process and technology

Technical standards, quality assurance measures, formulate technical management methods and implementation details.

 Previous: What is the advantage of the 280W beam
 Next: Development trend of stage lighting
  Links
 
About Us | News | Recruitment | Advisory | Contact Us
All rights reserved:Guangzhou Andy
粵ICP備17021536號-1    
平乡县| 铁岭市| 六安市| 平陆县| 钦州市| 余江县| 油尖旺区| 溧水县| 耒阳市| 景泰县| 大新县| 高雄市| 曲阜市| 左云县| 宣汉县| 乐亭县| 延川县| 吉安县| 淅川县| 汝阳县| 仪陇县| 周至县| 南开区| 邮箱| 益阳市| 潢川县| 邯郸县| 孟津县| 镇康县| 苍山县| 台山市| 日喀则市| 沈丘县| 平泉县| 深州市| 布拖县| 微博| 满城县| 渑池县| 南郑县| 甘德县|